GEOTECHNICAL WORKS
• Performing geotechnical studies projects of dam and hydroelectrical power plants related to master plan, feasibility, and final project.
• Determining material properties of concrete, agregate, filter, unpermeable clay center and rock filling, performing in-situ and laboratory tests for reserve determination.
• Determining sliding reasons of sliding or potential sliding rock or soil slopes or researching surface and ground for stability analysis and performing stability analysis.
• Designing geotechnical alignment maps for tunnel and underground structures and geotechnical classification of rocks by drilling down to tunnel elevation to obtain needed data, defining excavation and palting methods.
• Foundation investigation of central, factory, silo, viaduct, bridge piers and big buildings and geotechnical evaluation of foundation soil.
• Designing geotechnical maps of highway, state road and railway alignments, determining properties of foundation soil by trial pits, drillings and tests, proposing solution alternatives for ground water, natural and artificial slope stability problems.
• Determining soil properties of filling material, classification of excavation material, determining volume and properties of infrastructural material, designing superstructure project and geotechnical evaluation for highway design.
• Evaluation of foundation investigation of airports by drillings and in-situ tests.
• Determining quality and thickness of sediment for harbour, quay, breakwater, determining depth of basement rock and obtaining engineering data by evaluating the results for foundation project.
• Determining the most appropriate site for
built-up area by geotechnical and drilling works, proposing solution alternatives about environment and natural disasters, investigating the possibility of assuring water from ground or surface, performing geotechnical works for internal and external roads, determining reserve and properties of appropriate material .
• Damage determination of buildings, reinforcement against earthquakes and reperation tests, sampling from carrier systems, defining the equipment and properties, direct shear tests for concrete, cracked corrosion, preparing the proposal report.
|
DRILLING WORKS
• FOUNDATION DRILLINGS IN SOIL AND ROCK
• GROUNDWATER DRILLINGS
• MINING DRILLINGS
• DRAINAGE HOLE DRILLINGS
• IN-SITU TESTS AND SAMPLING
• MINI PILE APPLICATION
• JET-GROUTING APPLICATION
• BORED PILE APPLICATION
|
GROUTING WORKS
• Consolidation GROUTING to stabilize dam foundation rock
• CUT OFF, CAP, CURTAIN GROUTING to stabilize the impermeability of dams
• Consolidation GROUTING to strengthen lateral rock of tunnel and pressured tunnel to prevent leakage
• Contact GROUTING of tunnel and shafts
• Consolidation GROUTING to stabilize during land slides
• Joint GROUTING of dams
• Alluvium GROUTING
• Ground reinforcement GROUTING
|
LABORATORY WORKS
• Water Content TS 1900, BS 1377, ASTM D2216
• Liquid Limit TS 1900, BS 1377, ASTM D4318
• Plastic Limit TS 1900, BS 1377, ASTM D4318
• Uniaxial Shrinkage TS 1900, BS 1377
• Specific Gravity TS 1900, BS 1377, ASTM D854
• Unit Weight TS 1900, BS 1377
• Void Ratio-Porosity
• Saturation Degree
• Sieve analysis (wet-dry ) TS 1900, BS 1377, ASTM D422
• Hydrometer TS 1900, BS 1377, ASTM D422, AASTHO T85
• Triaxial Pressure Test (UU) TS 1900, BS 1377, ASTM D155
• Free Pressure Test (QU) TS 1900, BS 1377, ASTM D2166
• Consolidation TS 1900, BS 1377, ASTM D2435-D4546
• Compaction (standart-Modified) TS 1900, BS 1377, ASTM D558-D698 D1557 AASHTO T99- T134- T180
• Wet CBR Test TS 1900, BS 1377, ASTM D1883-D3668 D4429 AASHTO T-193
• Flatteness Index BS 812
• Agregate Unit Weight and Water Absorption TS 706
• Agregate Sieve Analysis TS 3530
• Agregate Loose and Dense Unit Weight TS 3529
• Soil Classification TS 1500, BS 5930, USC, AASHTO M145
• Rock and Agregate Specific Gravity ISRM
• Rock Point Load
• Rock Hardness with Schmidt Hammer ISRM
• Determining Velocity, Density and Strength with Ultrasonic Test
|